Jump to the main content block
- +
Print

News

News Detail
Category Construction
Title The 133K between 134K mileage location of Provincial Highway No.21 (New Central Cross-Island Road) will take traffic control measures whenever necessary because of open-cut tunnel construction work.
Date 2022-01-21 10:13
Deadline 2022-01-21 ~ 2022-11-30
Organization Second Maintenance Office-Traffic Control Center
Content

In order to improve road safety, the Sinyi Branch of the Directorate General of Highways will carry out open-cut tunnel construction work at the 133K between 134K mileage location of Provincial Highway No.21. The Sinyi Branch will take traffic control measures from 8:00 AM to 5:00 PM everyday until October 21, 2022. It will take flexibly two-way lane control less than 30 miniutes every o’clock and briefly open. Please follow the on-site pass command. The Sinyi Branch would like to thank motorists in advance for co-operation during this time.

The construction road section is a mountainous road. It’s narrow and the side slope often has rocks and landslides. Motorists are also urged to excise caution when driving in the area. The Directorate General of Highways appeals motorists to notice the information presented on CMS, and listen to the Police Broadcasting Service to get real-time traffic Information. Motorists who can visit on the website (https://168.thb.gov.tw) are also welcome, and the real-time traffic news or information is also regularly updated on that website.

The Directorate General of Highways wish you safe driving.

Construction Unit:the Sinyi Branch
Contact Person:Sun Wun-Chang, Section Chief of the Sinyi Branch
Contact Number:0934-457817, 049-2791510

Link
Attachment
Hits 206
Update Unit:Secretariat Research and Evaluation Section(1700)View:28,233 Previous Page
:::