Jump to the main content block
- +
Print

News

News Detail
Category Construction
Title The 75K between 112K mileage location of Provincial Highway No.8 (road section between New Kayo and Dayuling) will take traffic control measures from November 9 to November 30, 2021 except holidays and rainy day.
Date 2021-11-08 11:40
Deadline 2021-11-08 ~ 2022-01-31
Organization Second Maintenance Office-Traffic Control Center
Content

In order to carry out pavement scratching and asphalt patching works, the Guguang Branch of the Directorate General of Highways will take traffic control measures from 8:00 AM to 5:00 PM everyday during the period from November 9 through November 30, 2021 except holidays and rainy day.The traffic will take flexibly two-way lane control and briefly open. Please follow the on-site pass command. The Guguang Branch would like to thank motorists in advance for co-operation during this time.

The construction road section is a mountainous road. It’s narrow and the side slope often has rocks and landslides. Motorists are also urged to excise caution when driving in the area. The Directorate General of Highways appeals motorists to notice the information presented on CMS, and listen to the Police Broadcasting Service to get real-time traffic Information. Motorists who can visit on the website (https://168.thb.gov.tw) are also welcome, and the real-time traffic news or information is also regularly updated on that website.

The Directorate General of Highways wish you safe driving.

Construction Unit:the Guguang Branch
Contact Person:Lu Zheng-An, Section Chief of the Guguang Branch
Contact Number:04-25951224, 04-25951171

Link
Attachment
Hits 242
Update Unit:Secretariat Research and Evaluation Section(1700)View:28,229 Previous Page
:::